Australia Post Sorting Centre


Replacing Bored Piers/Driven Piles

Construction Problems

  • Site situated over 70 year old dumping ground, containing concrete and steel refuse.
  • Contaminated spoil to remove if bored piles used.
  • Over 800 piers required
  • Collapsing fill profile, voids within matrix
  • Project over budget

Solution

  • Design with screw piles.
  • Conduct test pile program to confirm penetration of fill and founding depths.
  • Project now brought back to budget.
  • Reduction of pile installation time.
  • Elimination of contaminated spoil issue.

Building on Strong Foundations

Proudly Australian Owned & Operated

Piling Systems is an Australian owned and operated company which specialises in the design, manufacture and installation of steel screw piles.

VIEW OUR SERVICES

What is a Screw Pile?

Proven Foundations for all Applications

  • Cost Effective
  • Fast (up to 100 piles a day)
  • Minimal Preparation
  • Vibration free installation
  • Eliminates contaminated fill removal
APPLICATIONS AND BENEFITS