CASE STUDIES

Rear Extention Elgin St Newport

Residential

Replacing concrete pads and stumps for timber floors

Construction Problems

Limited access to construction area, 1.2 metre width along side of house
High water table , founding depth of 4.5 metre

Solution

Use 1 tonne excavator with 1metre width for installation.
Redesign with screw piles in replacement of pads and stumps to underside of bearer
Need engineered screw piles for your next project? CONTACT US for a quote